• Webbing Cutting and Ultrasonic Folding Machine for Contain Bag
  • Webbing Cutting and Ultrasonic Folding Machine for Contain Bag
  • Webbing Cutting and Ultrasonic Folding Machine for Contain Bag
  • Webbing Cutting and Ultrasonic Folding Machine for Contain Bag
  • Webbing Cutting and Ultrasonic Folding Machine for Contain Bag
  • Webbing Cutting and Ultrasonic Folding Machine for Contain Bag

Webbing Cutting and Ultrasonic Folding Machine for Contain Bag

After-sales Service: Video Technical Support,Online Support,Spare Parts
Warranty: 1 Year
Machine Type: Cutting Machine
Computerized: Computerized
Wedding Width: 30-100mm(Max)
Cutting Length: 500-3000mm
Customization:
Diamond Member Since 2022

Suppliers with verified business licenses

Rating: 4.5/5
Manufacturer/Factory

Basic Info.

Model NO.
UW-DQJ-4
Cutting/Weleding Precision
+-2mm(Lift Ring Accuracy)
Production Ability
24-28PCS/Min
Temperature Control
0-400
Total Power
4.5kw
Production Speed
380V 50Hz 3-Phase with Zero-and Eath-Wire
Compressed Air Supply
6kg/Cm2
Condition
New
Transport Package
Wooden Case
Trademark
UNITED WIN
Origin
China

Product Description

Webbing Cutting and Ultrasonic Folding Machine For Contain Bag
 

Technical requirements:

1. Have the ultrasonic welding and hot cutting function after band folding

2. Have the marking and positioning function

 

 

Main Technical Parameter: 

 

Model UW-4 
Wedding Width 30-100mm (Max)
Cutting Length 500-3000mm
Production ability 24-28pcs/min
Total power  4.5kw
Cutting/Weleding precision ±2mm (Lift ring accuracy)
Production Speed 380V 50Hz  3-phase with zero-and eath-wire
Temperature Control 0-400ºC
Compressed air supply 6kg/cm²
 


 

Machine Photo:
Webbing Cutting and Ultrasonic Folding Machine for Contain Bag
Webbing Cutting and Ultrasonic Folding Machine for Contain Bag
Webbing Cutting and Ultrasonic Folding Machine for Contain Bag

Company Information:
Webbing Cutting and Ultrasonic Folding Machine for Contain Bag
 
 
FAQ:

1. How long will your engineer reach our factory?
 Within one week after everything ready (machine arrival your factory, non-woven material, power source, air compressor etc. Prepared)

 

2. How many days will you finish installing?
We will finish installation and training within 15 days.

 

3. What should we charge for your engineer?
 You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
 
4. Does your engineer understand English? 
Our engineers understand a little English. All our engineers have more than five years machine installation experience.
 
5.How could you do if the parts broken within warranty?
We would express the free replacement parts during the warranty date.

 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now