Multi-Pieces of Head Welding Machine for Tarpaulin

Product Details
Customization: Available
After-sales Service: Video Technical Support,Online Support,Spare Parts
Warranty: 1 Year
Diamond Member Since 2022

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Type of Ownership
Limited Company
Export Year
2019-01-01
  • Multi-Pieces of Head Welding Machine for Tarpaulin
  • Multi-Pieces of Head Welding Machine for Tarpaulin
  • Multi-Pieces of Head Welding Machine for Tarpaulin
Find Similar Products

Basic Info.

Model NO.
UW-RH-10
Welding Area
0-12 Cubic Meter
Welding Seam
0-40mm
Air Pressure
0.66-0.8MPa
Voltage
380V
Driven Type
Electric
Condition
New
Transport Package
Wooden Case
Trademark
UNITED WIN
Origin
China

Product Description

Multi-Pieces of Head Welding Machine For Tarpaulin 
 

Descripition:

Tarpaulin welding machine mainly includes three parts: the main device(equipped several heating head), foot pedal and roller car. The number of heating head and roller car can be determined by the order requirement.

Each heating head is equipped with a fan, which uses Autonics thermostat(the South Korea brand) to control, achieving high precision temperature control, the temperature tolerance is +/-1 degree. The main shaft is made from large diameter seamless steel pipe, which is plated with silver, ensuring the stable performance of the equipment in the high-speed operation. Our machine equipped a specific monitor, which can start and stop the machine at once, this can be highly efficient.


 

Main Technical Parameter: 
Model UW-RH-10
Voltage 380V
Power 5-8KW
Air pressure 0.66-0.8Mpa
Welding area 0-12m³
Welding seam 0-40mm
Welding speed 80-100m/min


 

Machine Shipping:
Multi-Pieces of Head Welding Machine for Tarpaulin
Multi-Pieces of Head Welding Machine for Tarpaulin


Company Information:
Multi-Pieces of Head Welding Machine for Tarpaulin
 
 
FAQ:

1. How long will your engineer reach our factory?
 Within one week after everything ready (machine arrival your factory, non-woven material, power source, air compressor etc. Prepared)

 

2. How many days will you finish installing?
We will finish installation and training within 15 days.

 

3. What should we charge for your engineer?
 You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
 
4. Does your engineer understand English? 
Our engineers understand a little English. All our engineers have more than five years machine installation experience.
 
5.How could you do if the parts broken within warranty?
We would express the free replacement parts during the warranty date.

 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier