Customization: | Available |
---|---|
Type: | Shuttle Loom |
Computerized: | Computerized |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Mould | Shuttle Qty. (pcs) |
Max.fold width (mm) |
Max. Open width (m) |
Warp no.s (pcs) |
Speed (RPM) |
Main power (kw) |
SPCL-24/16000 | 24 | 8200 | 164 | 8000 | 5~25 | 37 |
SPCL-20/11000 | 20 | 5500 | 110 | 5376 | 5~28 | 22 |
SPCL-16/8300 | 16(12) | 4150 | 83 | 4800 | 5~41 | 18.5 |
SPCL-12/7800 | 12(14) | 3900 | 78 | 4400 | 5~41 | 18.5 |
SPCL-12/7200 | 12(14) | 3600 | 72 | 3780 | 5~45 | 18.5 |
SPCL-12/6500 | 12 | 3250 | 65 | 3520 | 5~51 | 11/15 |
SPCL-12/6000 | 12(10) | 3050 | 61 | 3200 | 5~51 | 11/15 |
SPCL-12/5400 | 12(10) | 2700 | 54 | 2880 | 5~64 | 11/15 |
SPCL-10/4800 | 10(8) | 2400 | 48 | 2880 | 5~64 | 11 |
SPCL-10/4400 | 10(8) | 2200 | 44 | 2640 | 5~72 | 7.5/11 |
SPCL-8/3500 | 8 | 1750 | 35 | 1976 | 5~80 | 7.5 |
SPCL-6/3200 | 6(8) | 1400 | 30 | 1820 | 5~80 | 7.5 |
SPCL-6/2700 | 6pcs | 1350mm | 27m | 1510pcs | 5~100 | 7.5 |
1. How long will your engineer reach our factory?
Within one week after everything ready (machine arrival your factory, non-woven material, power source, air compressor etc. Prepared)
2. How many days will you finish installing?
We will finish installation and training within 15 days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
4. Does your engineer understand English?
Our engineers understand a little English. All our engineers have more than five years machine installation experience.
5.How could you do if the parts broken within warranty?
We would express the free replacement parts during the warranty date