Customization: | Available |
---|---|
After-sales Service: | Video Technical Support,Online Support,Spare Parts |
Warranty: | 1 Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Features:
1. Programmable PLC integrated control, touch man-machine interface operation, intuitive and easy to operate.
2. Double station take-up, unwind, pneumatic chuck, automatic unloading, winding, automatic conjunctiva.
3. The coating amount is adjustable, and the coating precision is precisely controlled.
4. Unwinding automatically finds the joint function to reduce the loss.
5. Automatic tension section control, the whole machine runs synchronously.
6. The oven adopts energy-saving box-type fan, which has high drying efficiency, and adopts multi-stage temperature control to accurately control the temperature of each section of the oven according to the process requirements.
7. Multi-point automatic deviation correction to ensure the uniformity of the winding.
Technical parameters:
Effective width | 550mm |
Discharge diameter | Max. ¢800mm |
Rewinding diameter | Max. ¢600mm |
Mechanical speed | 5-50m/min |
Coating substrate | Steam/Hot stove/Heat transfer oil/Electricity |
Oven length | Can be designed according to customer requirements |
Power supply | 380V 50HZ |
Oven temperature | 180ºC |
Temperature control accuracy | ±1.5ºC |
Total power | 30KW(about) |
Oven heating power | 85KW |
Oven length | 24M (according to customer requirements) |
Use voltage | 380V 50HZ 3P |
FAQ:
1. Are you a factory?
Yes, our company was established in 1998. It is the only comprehensive manufacturing enterprise in China produce both tape and
tape machine.
2. Can I get some tape samples for testing before placing order?
Yes,we can provide you some free samples for your reference.
3. How long is the delivery time for your tape?
The first order is 15 days after deposit,then other orders are about 7-10 days after deposit.
4. How could I get the quotation?
Tape: Please let me know the specification(thickness,width,length),quantity,application and other requirements according to your
needs so that we can provide an accurate quotation.
Machine: please provide the type of machine required and other special requirements.
5. Do you control the items quality?
Each machine strictly tested one by one before shipping.
6. How long is the delivery time for your machine?
After deposit is about 30 days.
7. What is quality guarantee policy?
12 months guarantee for all goods from our company, but we do not accept any broken by man.
8. When we receive the box, find any items missing or defective, how should we do?
Please contact us ASAP, we will check and give you best solution soon.