Double Functions Automatic Plastic Tarpaulin Fabric Dotting and Slitting Machine

Product Details
Customization: Available
After-sales Service: Video Technical Support,Online Support,Spare Parts
Warranty: 1 Year
Diamond Member Since 2022

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Type of Ownership
Limited Company
Export Year
2019-01-01
  • Double Functions Automatic Plastic Tarpaulin Fabric Dotting and Slitting Machine
  • Double Functions Automatic Plastic Tarpaulin Fabric Dotting and Slitting Machine
  • Double Functions Automatic Plastic Tarpaulin Fabric Dotting and Slitting Machine
  • Double Functions Automatic Plastic Tarpaulin Fabric Dotting and Slitting Machine
  • Double Functions Automatic Plastic Tarpaulin Fabric Dotting and Slitting Machine
Find Similar Products

Basic Info.

Model NO.
UW-DC-10
Voltage
380V
Power
4kw
Weight
2000kg
Dimension
3000*1500*1000mm
Condition
New
Transport Package
Wooden Case
Trademark
UNITED WIN
Origin
China

Product Description

Double Functions Automatic Plastic Tarpaulin Fabric Dotting And Slitting Machine

 

Features:

There are two functions with this machine, dotting and slitting, according to customers equirement.

 

 

Main Technical Parameter: 
Model UW-DC-10
Voltage 380V
Power 4KW
Weight 2000KG
Dimension 3000*1500*1000mm

 


Double Functions Automatic Plastic Tarpaulin Fabric Dotting and Slitting MachineDouble Functions Automatic Plastic Tarpaulin Fabric Dotting and Slitting MachineDouble Functions Automatic Plastic Tarpaulin Fabric Dotting and Slitting MachineDouble Functions Automatic Plastic Tarpaulin Fabric Dotting and Slitting MachineDouble Functions Automatic Plastic Tarpaulin Fabric Dotting and Slitting Machine

Company Information:

Double Functions Automatic Plastic Tarpaulin Fabric Dotting and Slitting Machine
 
 
FAQ:

1. How long will your engineer reach our factory?
 Within one week after everything ready (machine arrival your factory, non-woven material, power source, air compressor etc. Prepared)

 

2. How many days will you finish installing?
We will finish installation and training within 15 days.

 

3. What should we charge for your engineer?
 You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
 
4. Does your engineer understand English? 
Our engineers understand a little English. All our engineers have more than five years machine installation experience.
 
5.How could you do if the parts broken within warranty?
We would express the free replacement parts during the warranty date.

 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier