Customization: | Available |
---|---|
After-sales Service: | Video Technical Support,Online Support,Spare Parts |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Polypropylene Multifilament PP Spinning Machine Extrusion Line
Features:
1. Adopting lengthened screw rod extruder polyester with AC/DC variable frequency speed control
2. Adopting new spinning chamber and mixing/even melt pipes
3. Adopting large area spinneret with self-sealed component on round or rectangular shape
4. Adopting accurate-measuring planet gear pump and fast-detachable lifting/drawing drive rod
5. Adopting stable and even side-blowing device and large flow spraying/oiling system
6. Adopting environmental-friendly and energy-saving media electric heating system with imported intelligent instruments
7. Adopting 3-5 pairs of drawing roll to make drawing and thermal setting plus new-type terminal network device
8. Adopting domestic full-automatic switchable winder
9. Adopting continuous switchable filter to use recycled raw materials to produce filament with normal strength
10. The strength ofhigh strength yarn is guaranteed over 7g/daniel
Technical Parameters:
Number of locations of whole machine | 1,2,4 |
Distance between locations of spinning | 1200-2000mm |
Heads of spinning per location | 2,4,6,8 |
Size of end yarn | 180D-2100D |
Diameter of screw rod | φ30mm-120mm |
Dimension of draw roll | φ190*330mm |
Winding speed | 1500-3000m/min |
Suitable winders | A435 A635 A835 |
Application:
Company Information:
FAQ:
1. Are you trading company or manufacturer?
We are manufacturer, and also provide the business solution to all the friends.
2. What's payment terms you accept?
The buyer make the 30% deposite, the 70% balance will be paid by TT within 7 days before delivery or the buyer open 100% irrevocable L/C at sight as the appointed bank of the seller.
3. What's the delivery time?
The seller will arrange shipment within 90 working days once confirm the order.
4. How to install and debug the machine after arrival?
We will provide instructions and installation videos. If the Buyer needs engineers to install in the local area, the buyer should pay USD150 per day for subsidy of engineers and afford the charge of daily life(including the daily meal, traffic and hotel) in the locus of buyer and return tickets from China to User's factory.
5. Does it easy to operate and what can i do if it doesn't work?
First, our machine is stable and easy to operate by one man, what you do is just learn some basic thing. And we will sent you manual and video, we suggest you to come to visit our factory to learn more thing by yourself, and if there is something goes wrong, you can call us, video-chat, email us. And we will give solutions within 36 hrs. Our engineer also can be distributed to overseas as you required.
6. How long is your machine's warranty period?
Seller warrants the products for 13 months from the B/L date.