• Double Head Edges Folding Welding Machine for PE PVC Tarpaulin
  • Double Head Edges Folding Welding Machine for PE PVC Tarpaulin
  • Double Head Edges Folding Welding Machine for PE PVC Tarpaulin
  • Double Head Edges Folding Welding Machine for PE PVC Tarpaulin
  • Double Head Edges Folding Welding Machine for PE PVC Tarpaulin
  • Double Head Edges Folding Welding Machine for PE PVC Tarpaulin

Double Head Edges Folding Welding Machine for PE PVC Tarpaulin

After-sales Service: Video Technical Support,Online Support,Spare Parts
Warranty: 1 Year
Voltage: 380V
Power: 10.4kw
Air Pressure: 0.8MPa
Welding Area: 1200mm
Customization:
Diamond Member Since 2022

Suppliers with verified business licenses

Rating: 4.5/5
Manufacturer/Factory

Basic Info.

Model NO.
UW-RH-20
Welding Speed
0~80m/M
Jointing Seam Width
30~40mm
Driven Type
Electric
Condition
New
Transport Package
Wooden Case
Trademark
UNITED WIN
Origin
China

Product Description

Double Head Edges Folding Welding Machinehead For PE PVC Tarpaulin


Construction:

There are three parts for the machine
1. double heating head
2. transport belt
3. two operating platforms

 

Features:
1: Some electrical components adopted from abroad or domestic appointed suppliers, high quality and durable
2: High digital precision temperature control, temperature tolerance is +/-1 degree


 

Main Technical Parameter: 
Model UW-RH-20
Voltage 380V
Power 10.4KW
Air pressure 0.8Mpa
Welding Area 1200mm
Welding speed 0~80m/m
Jointing seam width 30~40mm
Driven type Electric

 
Machine Details:Double Head Edges Folding Welding Machine for PE PVC TarpaulinDouble Head Edges Folding Welding Machine for PE PVC TarpaulinDouble Head Edges Folding Welding Machine for PE PVC TarpaulinDouble Head Edges Folding Welding Machine for PE PVC TarpaulinDouble Head Edges Folding Welding Machine for PE PVC Tarpaulin

Company Information:
Double Head Edges Folding Welding Machine for PE PVC Tarpaulin
 
 
FAQ:

1. How long will your engineer reach our factory?
 Within one week after everything ready (machine arrival your factory, non-woven material, power source, air compressor etc. Prepared)

 

2. How many days will you finish installing?
We will finish installation and training within 15 days.

 

3. What should we charge for your engineer?
 You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
 
4. Does your engineer understand English? 
Our engineers understand a little English. All our engineers have more than five years machine installation experience.
 
5.How could you do if the parts broken within warranty?
We would express the free replacement parts during the warranty date.

 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now