Customization: | Available |
---|---|
After-sales Service: | Video Technical Support,Online Support,Spare Parts |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Description:
Water has three phases: solid, liquid and gaseous. According to the theory of phase equilibrium in thermodynamics, with the decrease of pressure, the freezing point of water does not change much, but the boiling point is getting lower and lower, and approaches the freezing
point. When the pressure drops to a certain vacuum, the boiling point of water coincides with the freezing point, and the ice can be directy vaporized into gas without being liquid. This process is called sublimation. Vacuum freeze-drying is to sublimate and remove frozen water from food under the three-phase point of water, i.e. at low temperature and low pressure. According to this principle, the wet matenal in the material can be frozen below the freezing point, so that the moisture in the material can be changed into solid ice, the the ice can be directly converted into steam under the appropriate vacuum environment, and then the water vapor condenser in the vacuum system can be used to condense the water vapor, so that the material can be dried. This method of obtaining drying by vacuum freezing is a process of changing and moving the state of water. This process occurs at low temperature and low pressure. Therefore, the basic princip e of freeze drying is the mechanism of heat and mass transfer at low temperature and low pressure We dry the material in freezing condition. During the drying process, the ice does not melt. The process of direct vaporization and dryingof ice from solid state is called freeze-drying (for short, freeze -drying).
Technical Parameters:
Model | UW-0.5A | UW-1A | UW-5A | UW-10A | UW-20A |
Control mode | Microcomputer automatic | ||||
Working mode | Frozen freeze-dried | ||||
Body material | 304 Stainless steel | ||||
Dry area(m2) | 0.5 | 1 | 5 | 10 | 20 |
Charge amount(kg) | 5 | 5 | 9 | 17 | 34 |
Tray size(mm) | 300*400*25 | 400*500*25 | 600*1000*25 | 600*1000*25 | 600*1000*25 |
Tray number | 5 | 5 | 9 | 17 | 34 |
Tray mode | 304 stainless steel disc | ||||
Shelf number | 6 | 6 | 13 | 18 | 35 |
Shelf temperature | -35-120ºC | ||||
Shelf material | Silicone oil at low temperature | ||||
Catch water qty(kg) | ≥5 | ≥10 | ≥50 | ≥100 | ≥200 |
Vaccum pump | Rotary vane pump | Rotary vane pump+roots pump | |||
Working vacuum | ≤130pa | ||||
Ultimate vacuum | <10pa | ||||
Frost way | Hot water spray | ||||
Compressor | Fully closed import | ||||
Working environment temperature | ≤40ºC | ||||
Rated power(kw) | 5 | 6 | 16 | 28 | 45 |
Dimensions | 1900*900*2100 | 1950*900*2100 | 3400*1800*2200 | 4200*1800*2900 | 6200*2500*3300 |
work period | 12h Frozen freeze-dried |
Model | UW-30w | UW-50w | UW-100w | UW-200w |
Control mode | Microcomputer automatic | |||
Working mode | freeze-dried | |||
Body material | 304 Stainless steel | |||
Dry area(m2) | 30 | 50 | 100 | 200 |
Charge amount(kg) | 300 | 500 | 1000 | 2000 |
Tray size(mm) | 600*1000*25 | 600*1000*25 | 600*1000*25 | 600*1000*25 |
Tray number | 50 | 84 | 168 | 334 |
Tray mode | 304 stainless steel disc | |||
Shelf temperature | 0-120ºC | |||
Shelf material | Silicone oil at low temperature | |||
Catch water qty(kg) | ≥300 | ≥500 | ≥1000 | ≥2000 |
Vaccum pump | sundstrand pump | |||
Working vacuum | ≤130pa | |||
Ultimate vacuum | <10pa | |||
Frost way | Hot water spray | |||
Compressor | Frascold | |||
Working environment temperature | ≤40ºC | |||
Rated power(kw) | 20 | 30 | 60 | 120 |
work period | 10-12h |
Application:
1. How long will your engineer reach our factory?
Within one week after everything ready (machine arrival your factory, non-woven material, power source, air compressor etc. Prepared)
2. How many days will you finish installing?
We will finish installation and training within 15 days.
3. How could you do if the parts broken within warranty?
We would express the free replacement parts during the warranty date
4. What should we charge for your engineer?
You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
5. How long is your machine's warranty period?
All our machine has one year guarantee for electricity parts and two years guarantee for mechanism, starting from finished installation.
6. Does your engineer understand English?
Our engineers understand a little English. All our engineers have more than five years machine installation experience.
7. Can you help us find any engineer in our location?
Of course, we will check and inform you as soon as possible.
8. How could you do after one year warranty period?
We also can-do service for you, but you need pay salary for our technicians 80USD/day for each person.